Mystic Vines Cable Cowl
Get tangled up in the Mystic Vines Cable Cowl. This intricate cable knit cowl pattern is a beautiful cold weather knit to add to your fall and winter wardrobe. The pattern uses Bernat Satin Sparkle, which adds an extra shimmer to your knitting and makes this cowl even more mystical. We love the deep blue color of this cowl, but feel free to use any other worsted weight sparkly yarn for that ethereal look. So next time you're in a magical mood, get out your needles and knit up the Mystic Vines Cable Cowl.
Knitting Needle Size8 or 5 mm
Yarn Weight(4) Medium Weight/Worsted Weight and Aran (16-20 stitches to 4 inches)
Materials:
- Bernat® Satin Sparkle™ (80 g/2.8 oz: 146 m/160 yds)
- Sapphire (53110) 2 balls
- Size 5 mm (U.S. 8) knitting needles or size needed to obtain gauge
- Cable needle
GAUGE
18 sts and 24 rows = 4" [10 cm] in stocking st.
ABBREVIATIONS
Alt = Alternate(ing)
Approx = Approximately
Beg = Beginning
C4B = Slip next 2 stitches onto a cable needle and leave at back of work. K2, then K2 from cable needle.
C4F = Slip next 2 stitches onto a cable needle and leave at front of work. K2, then K2 from cable needle.
C6B = Slip next 3 stitches onto a cable needle and leave at back of work. K3, then K3 from cable needle.
C6F = Slip next 3 stitches onto a cable needle and leave at front of work. K3, then K3 from cable needle.
Cont = Continue
K = Knit
MB = [(K1. P1) 3 times. K1] all in next stitch. Slip 6th, 5th, 4th, 3rd, 2nd and first stitches separately over 7th stitch. 1 stitch remains -Bobble complete.
P = Purl
Pat = Pattern
Rep = Repeat(s)
RS = Right side
St(s) = Stitch(es)
Tog = Together
T4B = Slip next stitch onto a cable needle and leave at back of work. K3, then P1 from cable needle.
T4F = Slip next 3 stitches onto a cable needle and leave at front of work. P1, then K3 from cable needle.
MEASUREMENTS
Approx 6" x 46" [15 x 117 cm].
INSTRUCTIONS
Cable Panel A (worked over 30 sts). (See Chart)
1st row: (RS). P2. MB. P2. C6F. P8. C6F. P2. MB. P2.
2nd and alt rows: Knit all knit sts and purl all purl sts as they appear.
3rd and 5th rows: P5. K6. P8. K6. P5.
7th row: P2. MB. P2. C6F. P8. C6F. P2. MB. P2.
9th row: P4. T4B. T4F. P6. T4B. T4F. P4.
11th row: P3. T4B. P2. T4F. P4. T4B. P2. T4F. P3.
13th row: P3. K3. P4. T4F. P2. T4B. P4. K3. P3.
15th row: P3. T4F. P4. T4F. T4B. P4. T4B. P3.
17th row: P4. T4F. P4. C6B. P4. T4B. P4.
19th row: P2. MB. P2. (T4F. P2. T4B) twice. P2. MB. P2.
21st row: P6. (T4F. T4B. P2) twice. P6.
23rd row: P2. MB. P4. (C6F. P4) twice. P4. MB. P2.
25th row: P6. (T4B. T4F. P2) twice. P4.
27th row: P2. MB. P2. (T4B. P2. T4F) twice. P2. MB. P2.
29th row: P4. T4B. P4. C6B. P4. T4F. P4.
31st row: P3. T4B. P4. T4B. T4F. P4. T4F. P3.
33rd row: P3. K3. P4. T4B. P2. T4F. P4. K3. P3.
35th row: P3. T4F. P2. T4B. P4. T4F. P2. T4B. P3.
37th row: P4. T4F. T4B. P6. T4F. T4B. P4.
38th row: As 2nd row.
These 38 rows form Cable Panel A.
Cable Panel B (worked over 6 sts). (See Chart)
1st row: (RS). C6B.
2nd and alt rows: P6.
3rd and 5th rows: K6.
6th row: P6.
These 6 rows form Cable Panel B.
Cable Panel C (worked over 6 sts). (See Chart)
1st row: (RS). C6F.
2nd and alt rows: P6.
3rd and 5th rows: K6.
6th row: P6.
These 6 rows form Cable Panel B.
Cast on 42 sts.
1st row: (RS). K6. P5. K6. P8. K6. P5. K6.
2nd row: P6. K5. P6. K8. P6. K5. P6.
Proceed in pat as follows:
1st row: (RS). Work 1st row of Cable Panel B. Work 1st row of Cable Panel A. Work 1st row of Cable Panel C.
2nd row: Work 2nd row of Cable Panel C. Work 2nd row of Cable Panel A. Work 2nd row of Cable Panel B.
3rd row: Work 3rd row of Cable Panel B. Work 3rd row of Cable Panel A. Work 3rd row of Cable Panel C.
4th row: Work 4th row of Cable Panel C. Work 4th row of Cable Panel A. Work 4th row of Cable Panel B.
Cabel Panels A, B and C are now in position.
Cont in pat until work from beg measures approx 46" [117 cm], ending on a 38th row of Cable Panel A. Cast off.
Sew cast on and cast off edges tog.